Roofing deposits, progress payments and contract terms: the legal limits in each state

Maximum deposits for re-roofing and cladding contracts in NSW, Victoria, Queensland and WA, how to set progress payments, and what a written roofing contract must include.

Updated · 5 min read

Roofing deposits, progress payments and contract terms: the legal limits in each state

Most states cap the deposit a contractor can take on residential building work. As at October 2026: NSW 10% of the contract price; Victoria 5% where the contract price is $20,000 or more and 10% where it is less (Domestic Building Contracts Act 1995 s. 11); Queensland 20% for contracts of $3,300 or less, 10% for $3,301 to $19,999 and 5% for $20,000 or more; WA 6.5% for contracts under the Home Building Contracts Act ($7,500 to $500,000). After the deposit, payments should follow completed stages of work, and the contract should be written, signed and dated, list the scope, price, timing, variations process and warranties, and, where required, come with the home warranty insurance certificate before any money changes hands.

This guide is part of the roof replacement quote checklist. It is general information, not legal advice.

Deposit caps by state

StateDeposit capWritten contract requiredNotes
NSW10%Over $5,000 (small job contract $5,000–$20,000; large job contract over $20,000)No deposit until HBC cover is in place and the certificate is given, where HBC is required
Victoria5% if price is $20,000 or more; 10% if lessMajor domestic building contracts over $10,000Home Warranty insurance applies over $20,000 for contracts from 1 July 2026
Queensland20% up to $3,300; 10% from $3,301 to $19,999; 5% from $20,000Domestic building contracts over $3,300 need written contracts with cooling-off informationUp to 20% may be allowed where off-site custom work is more than 50% of the price
WA6.5%Home Building Contracts Act applies to $7,500–$500,000Up to 20% for off-site cabinetry over 50% of value
SA, Tas, ACT, NTCheck the regulatorCheck the regulatorRules exist in each; confirm current figures

Figures for NSW, Victoria, Queensland and WA were checked against regulator guidance and legislation in October 2026. Victoria's Domestic Building Contracts Amendment Act 2025 is due to take effect by 1 December 2026 and allows deposit limits and progress payment stages to be set by regulations, so check Consumer Affairs Victoria or the BPC for any new caps before you sign. Run any contract price through the deposit limit check.

Worked example (illustrative)

A $18,500 metal re-sheet:

  • NSW: 18,500 × 10% = $1,850 maximum deposit.
  • Victoria: price is under $20,000, so 10%: 18,500 × 10% = $1,850.
  • Queensland: $3,301 to $19,999 band, so 10%: $1,850.
  • WA: 6.5%: $1,202.50.

If the price rises above $20,000 by variation, the Queensland cap for the contract changes band; ask the QBCC how that applies to deposits already paid.

Setting progress payments for a roof

Progress payments should match work actually done, so you are never far ahead of the contractor. A typical four-stage schedule for a re-roof:

StageTriggerIllustrative share
DepositContract signed and insurance certificate receivedWithin the legal cap, e.g. 5–10%
Strip and prepareOld roof removed, battens and sarking or blanket installed, roof weathertight30–35%
Roof coveringSheets or tiles, ridges and flashings installed35–40%
CompletionGutters, downpipes, clean-up, certificates handed over, your inspection doneBalance, e.g. 15–25%

NSW large job contracts must include a progress payment schedule. In all states, avoid paying for materials before they are delivered to your site unless the contract gives you clear title to them.

What the contract should say

A written roofing contract should cover at least:

  1. Parties: your name, the contractor's legal name, ABN and licence or registration number.
  2. Property address.
  3. Scope: the items in the quote, with product names, profiles and colours, and the roof area.
  4. Price: fixed price, or clear provisional sums and prime cost items with how they are adjusted. GST included.
  5. Deposit and progress payments: amounts and triggers as above.
  6. Start and completion dates: and how weather delays are handled.
  7. Variations: must be in writing, priced and signed before the work is done.
  8. Unforeseen work: unit rates for things like rotten timber.
  9. Approvals: who obtains any permits and certificates.
  10. Insurance: home warranty insurance details where required; the contractor's public liability cover.
  11. Warranties: statutory warranties under your state's law plus any workmanship and product warranties.
  12. Disputes: the steps and the relevant state body. In NSW, arbitration clauses in home building contracts are void.
  13. Cooling-off: where it applies, such as five clear business days for NSW contracts over $20,000, or 10 business days for unsolicited agreements under the Australian Consumer Law.

Red flags in payment terms

  • A deposit above the legal cap, or "materials deposit" demands that exceed it
  • Payment in cash only or to a personal account that does not match the licence holder
  • Large payments before any work starts
  • A final payment due before you can inspect
  • Pressure to pay "today" to secure a price

If you have already overpaid

If you paid more than the legal deposit, you may not be able to recover the excess through home warranty insurance; the QBCC states this explicitly for Queensland. Raise it in writing with the contractor and ask for the excess to be credited against the next stage. If the contractor stops work or disappears, contact your state regulator promptly. See roofing problems and where to get help.

Frequently asked questions

Can a roofer ask for a separate payment for materials?

The total paid before work starts generally counts towards the deposit cap. Ask the regulator if a contractor insists on a separate materials payment.

Does the cap apply to small repair jobs?

Caps apply to contracts covered by the state's home building law, which have their own value thresholds. Very small jobs may fall outside, but paying large sums upfront is still risky.

What if the contract has no progress schedule?

Ask for one before signing. Tying payments to stages protects both sides.

Can I withhold payment for defects?

Withholding is a legal step with consequences. Raise defects in writing and seek advice from your state regulator before withholding money.