How to compare three roofing quotes like for like (with a worked comparison)

Line up re-roof quotes in Australia on the same scope, area and inclusions, adjust for missing items and payment terms, and decide on value rather than headline price.

Updated · 4 min read

How to compare three roofing quotes like for like (with a worked comparison)

To compare roofing quotes fairly, first put them on the same scope: the same roof area, the same removal, battens, sarking, roof covering, flashings, gutters and safety equipment. Then add the cost of anything a quote leaves out, convert each to a total for the same job, and only then compare price, along with licence, insurance, warranty, payment terms and start date. The cheapest headline quote often stops being cheapest once missing items are priced in. The worked example below shows the method with illustrative figures.

This guide is part of the roof replacement quote checklist.

Step 1: build a comparison table

Make a table with one row per item and one column per quote. Use your own job brief as the scope.

ItemQuote AQuote BQuote C
Roof area used
Remove and dispose
Battens
Sarking or blanket
Roof material and profile
Flashings, ridges, valleys
Gutters and downpipes
Edge protection or scaffold
Approvals and certificates
GST included?
Deposit and stages
Workmanship warranty
Licence checked
Home warranty insurance

Mark each cell as included, excluded or unclear. Ask each contractor to clarify every "unclear" in writing.

Step 2: worked example (illustrative)

Three quotes for a 200 m² tile-to-steel re-roof in Brisbane, all including GST:

ItemQuote AQuote BQuote C
Headline price$22,900$27,800$26,300
Area used185 m²205 m²200 m²
BattensReuse existingNew steel battensRefix and add where needed
BlanketNot includedIncludedIncluded
Gutters and downpipesNot includedIncludedIncluded
Edge protectionIncludedIncludedIncluded
Deposit requested20%5%5%
StartNext week6 weeks4 weeks

Adjust for the area

Quote A uses 185 m², which is low against your own measurement of about 200 m². Ask how they measured. If the roof is really 200 m², quote A will either be varied upwards later or has under-measured.

Price the missing items

Using illustrative rates:

  • Quote A: blanket 200 m² × $13 = $2,600; gutters and downpipes $3,900; battens may need replacing at 200 m² × $15 = $3,000 if reuse turns out unsuitable.
  • Quote B: nothing missing.
  • Quote C: nothing missing; battens partly reused.

Adjusted totals:

  • Quote A: $22,900 + $2,600 + $3,900 = $29,400, or $32,400 if battens must be replaced.
  • Quote B: $27,800.
  • Quote C: $26,300.

Quote A goes from cheapest to most expensive once the scope is matched.

Check the deposit

In Queensland the deposit cap for contracts of $20,000 or more is 5%. Quote A's 20% deposit is above the cap, a red flag on its own, and the QBCC warns that overpaid deposits cannot be recovered through the Home Warranty Scheme. Check any quote with the deposit limit check.

Weigh the non-price factors

Quote C is $1,500 cheaper than B, starts two weeks earlier and partly reuses battens. Ask C to confirm in writing that the reused battens meet the steel manufacturer's spacing requirements for the wind classification. If they do, C is the better value on these facts.

Step 3: check the paperwork for your shortlist

Signs a quote needs more questions

SignWhy it matters
Much lower than the othersLikely missing scope, under-measured, or a different product
Much higher than the othersMay include extra work you did not ask for, or a premium product; ask why
Price only, no itemisationHard to compare and harder to resolve disputes
Deposit above the legal capUnlawful and unprotected
"Today only" discountHigh-pressure sales; take your time
No licence number on the quoteCheck before going further
Cash discount for no paperworkRemoves your protections and may be unlawful

Use the estimator as a sanity check

Enter your measured area in the re-roof cost estimator. If all three adjusted quotes sit inside the estimator's illustrative range, the comparison is about scope and service. If one sits far outside, ask why before you decide. Remember the ranges on this site are illustrative and your local market may be higher or lower.

Frequently asked questions

Should I tell contractors about the other quotes?

You can, but do not share one contractor's itemised quote with another. Asking each to quote the same written scope is the fairest approach.

Is a longer workmanship warranty worth paying more for?

It can be, but a warranty is only as good as the business behind it, and statutory warranties under your state's building law apply regardless. Licence history and home warranty insurance matter more.

What if the cheapest contractor can start immediately?

Fast availability can be genuine, but after storms it can also signal an out-of-area operator. Check the licence and insurance especially carefully.

Should I pick the middle quote?

Not automatically. Pick the quote that best matches the scope you need at a fair adjusted price from a licensed, insured contractor.